The most important and most
difficult part in achievement of your cherished purpose (built house) is the
stage of the individual planning. Deciding this question you, it is assured
get:
2. Possibility (within 1 –go a dollar) of miscalculation of estimate
cost on building of your house. Only two points, but they (trust our
experience) – most important.
Planning (without a concordance in the proper instances) cost
approximately 20 – 50 dollar after
The complete «package of documents» plugs in itself two basic sections
an architectural-build part (sketches, drafts from foundation to the roof) and
engineering sections (HV is heating and ventilation, WS is a water-supply and
sewage system, EE is internal electrical equipment).
The complete set of project document looks like the following:
GL (general layout);
PP (preliminary planning);
ABP (architectural-build part);
HV (headings and ventilations);
WS (water-supply’s and sewage systems);
SI (project of power supply and illumination);
VO (visualization of object is in 3d).
We are glad
to any
collaboration, not dependency upon sizes, cost and complication of project.